A-18.1, r. 5.1 - Regulation respecting the scaling of timber harvested in forests in the domain of the State

Full text
13. Every timber transportation authorization and loading registration form must be handed over on arrival at the timber unloading point and be completed indicating the date, hour of arrival and, where applicable, the weighing data. It must then be signed by a culler before it is sent to the Minister.
The original or, failing that, a copy of the form must be kept and filed in a register kept for that purpose by the timber recipient.
O.C. 724-2013, s. 13.